IT Certification
Dell DES-4421 Real Exam Questions
Last Update: 03 Oct 2023$39.00
Guarantee your DES-4421 exam success with examkiller's study guide. The DES-4421 practice test questions are developed by experiences Dell Certification Professionals who workin...Description
Guarantee your DES-4421 exam success with examkiller's study guide. The DES-4421 practice test questions are developed by experiences Dell Certification Professionals who working in todays prospering companies and Dell exam data center.
Exam Number: DES-4421
Exam Title: Specialist Implementation Engineer PowerEdge MX Modular (DCS-IE)
Format: Single and Multiple Choice
Part1: Duration: 90 Minutes Number of Questions: 54 Passing Score: 63%
Part2: Duration: 30 Minutes 6 Simulations Passing Score: 66%
Origin Provider: ExamKiller
Total Questions: 54 QAs
Type: Real Exam Questions
Guarantee: 100% Pass Guarantee
Demo: Click Here for Check Demo
Dell DES-4421 Exam Objectives
MX-Series Portfolio Overview (14%)
• Describe MX7000 hardware chassis components and numbering schemes
• Describe MX7000 compute and storage sled components
• Describe MX5016s storage sleds and configurations
• Describe MX750c compute sled (15G) and features
MX7000 Administration (38%)
• Describe the MX Chassis Management Architecture and multi-chassis management groups
• List and describe key features of OME-M that supports management of the MX7000 chassis
• Describe storage sled management, Fabric C, mapping drives, and drive/enclosure assigned configuration
• Describe use of slot profiles, daisy chains, simplification, and consolidation, logs, and the iDRAC Service Module
• Describe how to perform firmware updates
• Describe use of key features of iDRAC, touching on considerations specific to MX Modular, including resetting iDRAC
• Describe the Lifecycle Controller and the main features
• Describe the Telemetry Advance License, OpenID Connect, Left Control Panel, (LCD) PIN management, Right Control Panel Field Replacement Auto-configuration and Proof of possession features in OME-M
MX7000 Installation (17%)
• Describe the infrastructure and out-of-the-box setup on an MX7000
• Describe the initialization installation power-on
• Describe the concepts for initial chassis configuration using the Chassis Deployment Wizard
• Describe use of compute sleds, including location
MX7000 Implementation (17%)
• List and describe hardware requirements of the various MX7000 network configurations
• Describe the fabrics and types of implementation used by the MX7000 switches
• Describe the Switch Operating Modes in MX7000
• Describe Fabrics in Chassis Management Groups and Chassis backup lead
• List and describe initial switch setup requirements
• Describe the SmartFabric Architecture and deployment process
• Describe the VLAN Scale and L2 multicast Operation
MX7000 Troubleshooting (17%)
• Describe minimum POST configuration, OME-M alerts and logs, OME-M health stats messages, LCD alerts and troubleshooting and RCP Auto-config Restoration
• Describe troubleshooting the MX7000 hardware, network issues, iDRAC and Lifecycle Controller